List of generating stations in Alberta

This is a list of electrical generating stations in Alberta, Canada.

Alberta produces a large share of its electricity through natural gas and a decreasing share of its electricity through coal (the latter to be phased out by 2023, seven years ahead of the provincial and federal phase-out).[1] Over the last few years, a booming economy and the deregulation of the electricity market has led to the construction of dozens of new facilitiesprimarily[2] alternatives (cogeneration, waste heat recovery) and renewables (e.g. wind, solar, biomass, biogas)and the retirement of over a dozen coal-fired and older gas-fired units.[2][3]

Fossil fuel

  Facilities partially operational
  Facilities under construction
  Planned facilities
  Decommissioned facilities (year)

Coal

List of all coal power plants in Alberta.

Name Location Capacity (MW) Date Owner Ref
Genesee Generating Station units 1 & 253°20′35″N 114°18′11″W8601989–1994Capital Power[4]
Genesee Generating Station unit 353°20′35″N 114°18′11″W4662005Capital Power[5]
Battle River Generating Station units 1 & 2Forestburg(56)(1998)Heartland Generation[6]
Keephills Generating Station unit 1Duffield395(2021)TransAlta-
Keephills Generating Station unit 3Duffield466(2021)Capital Power[8]
Sundance Power Station units 4 & 553°30′27″N 114°33′26″W812(2021)TransAlta[9]
H. R. Milner Generating StationGrande Cache(158)(2019)Milner Power[10]
Wabamun Generating Station Units 1–4Wabamun(570)(2003–2010)TransAlta[11]

Natural gas

List of all natural gas power plants in Alberta including cogeneration.

Name Location Capacity (MW) Date Owner Ref
Alberta Power Project – BurdettBurdett72001Maxim Power[12]
Alberta Power Project – CoaldaleCoaldale62001Maxim Power
Alberta Power Project – TaberTaber82001Maxim Power
Aurora Generating StationAurora851999Syncrude[13]
Balzac Power Station Nexen IncBalzac1202001Nexen[14]
Battle River Generating Station unit 4Forestburg1552022Heartland Generation[15]
Battle River Generating Station unit 5Forestburg3852021Heartland Generation[16]
Bear Creek Gas Turbine 1 & 2Grande Prairie1002002TransCanada[17]
Bellshill Power CentreGalahad5.62015Genalta Power[18]
Cadotte Power CentrePeace River202012Genalta Power[19]
Calgary Energy CentreCalgary3202002Enmax[20]
Carseland Power PlantCarseland952001TransCanada
Carson Creek Power CentreWhitecourt152014Genalta Power[21]
CascadeYellowhead County9002023Kineticor Resource Corp[22]
Cavalier Gas PlantStrathmore1202001Enmax
Clover Bar Energy Centre53°35′14″N 113°21′56″W2502008–2009Capital Power[23]
Cold LakeCold Lake1682002Imperial Oil
Crossfield Energy CentreRocky View1442009Enmax[24]
DrywoodDrywood62000TransAlta
Empress Cogeneration Power Facility Cypress County 45 2022 Pembina Pipeline [25]
Fort Saskatchewan Cogeneration PlantFort Saskatchewan1181999Strongwater Energy, TransAlta[26]
Foster Creek CogenerationBonnyville982003Cenovus
Genesee Power Plant Natural Gas Conversion Leduc County 1360 2024 Capital Power [27] [28]
Harvest Operations Gas Fired Power Plant Flagstaff County 5.6 202x Harvest Operations Corp. [29]
Heartland Petrochemical ComplexStrathcona County1162021Inter Pipeline Ltd.[30]
H. R. Milner Generating StationGrande Cache2082020Milner Power[31]
Joffre Cogeneration PlantRed Deer4742000Capital Power Corporation, NOVA Chemicals, Heartland Generation[32]
Judy Creek Power CentreWhitecourt152014Genalta Power[33]
Kaybob South #3 Cogeneration PlantGreenview County402022TransAlta, SemCAMS[34]
Keephills Generating Station unit 2Duffield3952021TransAlta[35][36]
Keephills Generating Station unit 3Duffield4632021Capital Power[37]
MacKay River Power PlantFort McMurray2072003TransCanada
Mazeppa Gas PlantMazeppa17MFC Resource Partnership
Medicine Hat Cogeneration PlantMedicine Hat2552007–2009City of Medicine Hat
Muskeg River Mine Cogeneration Station57°18′0″N 111°30′0″W1722002Heartland Generation[38][39]
Northern Prairie Power ProjectGrande Prairie1052008Constellation Energy[40]
Peace River Power CentrePeace River202015Genalta Power[41][42]
Poplar Creek Cogeneration PlantFort McMurray3762001TransAlta
Poplar Hill Generating PlantGrande Prairie

55°20′20″N 119°13′07″W

481999Heartland Generation[43]
Primrose Cogeneration PlantPrimrose1001998Canadian Natural resources, Heartland Generation[44]
Rainbow Lake Generating StationRainbow Lake971968–2001Heartland Generation, Husky Oil[45][46]
Redwater CogenerationRedwater922001TransCanada
Scotford Air LiquideFort Saskatchewan1062000Air Liquide Canada
Scotford Cogeneration PlantFort Saskatchewan1952003Heartland Generation[47]
Sheerness Generating StationHanna8001986–1990Heartland Generation, TransAlta[48][49]
Shepard Energy CentreCalgary8682015ENMAX, Capital Power[50]
Sturgeon Generating PlantValleyview181957–1961ATCO Power[51]
Sundance Power Station unit 453°30′27″N 114°33′26″W1132021TransAlta[9]
Sundance Power Station unit 653°30′27″N 114°33′26″W4012021TransAlta[52]
Three Creeks Power Plant Peace No. 135 100 202x Kineticor Resource Corp. [53]
University of Alberta Heating PlantUniversity of Alberta39.71994–2000University of Alberta[54]
University of Calgary Central Heating and Cooling PlantUniversity of Calgary122011University of Calgary[55] [56]
Valleyview 1 and 2 Generating PlantsValleyview902001–2008Heartland Generation[57]
Clover Bar Generating Station Units 1-4Edmonton(660)(2005)Capital Power[58][59]
Medicine Hat Gas Power Units 5 & 8Medicine Hat(37)(2009)City of Medicine Hat
Rossdale Generating Station Units 8–10Edmonton(209)(2009)Capital Power

Renewable

Biomass, biogas, and waste heat recovery

List of all biomass, biogas and waste heat recovery power plants in Alberta.

Name Location Capacity (MW) Date Owner Type Ref
Alberta Pacific ForestAthabasca1311993–2012Alberta Pacific ForestBiomass[60]
Bear Creek Steam TurbineGrande Prairie302002TransCanadaBiomass
Cancarb Waste Heat Recovery PlantMedicine Hat422000Tokai Carbon Co. Ltd.Waste heat[61]
Clover Bar Landfill GasEdmonton52005Capital PowerBiogas[62]
Dapp Biomass ProjectDapp161999Verdant EnergyBiomass[63]
Gold Creek Generation Facility54°49′59″N 118°39′10″W51999Maxim PowerWaste heat[64]
Grande Prairie Generating StationGrande Prairie252005TransAltaBiomass
Grande Prairie Pulp MillGrande Prairie482011Weyerhaeuser CanadaBiomass
East Calgary Landfill Gas to Electricity FacilityCalgary12023City of CalgaryBiogas[65]
Hinton Pulp Units 1 & 2Hinton501985–2011West Fraser TimberBiomass[66]
Judy Creek ORCSwan Hills2.22012Genalta PowerWaste Heat[67]
Peace River Pulp MillPeace River521990–2012Daishowa-Marubeni InternationalBiomass[68]
Valley PowerDrayton Valley121996Algonquin PowerBiomass[69]
Wheatland BioFuel FacilityWheatland County12022Carbon Clean Energy Inc.Biogas[70]
WhitecourtWhitecourt251994Macquarie Power & InfrastructureBiomass[71]

Geothermal

List of all geothermal power stations in Alberta. More than 388,500 MW of geothermal generation potential remains untapped, which is approximately 24 times Alberta's total installed generating capacity in 2019.[72]

Name Location Capacity (MW) Date Owner Ref
Greenview Geothermal Power Plant (Alberta No. 1) Municipal District of Greenview No. 16 5 2023 Terrapin Geothermics [73]

Hydroelectric

List of all hydroelectric power stations power plants in Alberta. More than 11,500 MW of hydroelectric potential remains untapped.[74]

Name Location Capacity (MW) Date Owner Ref
Amisk Hydroelectric Project Dunvegan 370 202x[note 1] Concord Green Energy [75][76]
Barrier Hydroelectric DamSeebe131947TransAlta[77]
Bearspaw Hydroelectric DamCalgary171954TransAlta[78]
Belly River Hydroelectric DamGlenwood31991TransAlta[79]
Bighorn Dam52°18′32″N 116°19′45″W1201972TransAlta[80]
Brazeau Hydroelectric Dam52°57′59″N 115°34′44″W3551965TransAlta[81]
Cascade Hydroelectric DamBanff361942TransAlta[82]
Chin Reservoir StationChin11.41994Irrican Power[83]
Dickson Dam52°03′06″N 114°13′07″W151992Algonquin Power[84]
Drop 4, 5, and 6 Hydroelectric PlantRaymond6.92004Irrican Power
Ghost Hydroelectric DamCochrane511929TransAlta[85]
Horseshoe Hydroelectric DamSeebe141911TransAlta[86]
Interlakes Hydroelectric DamKananaskis51955TransAlta[87]
Kananaskis Hydroelectric DamSeebe191913TransAlta[88]
Oldman River Hydroelectric PlantPincher Creek322003ATCO Power[89]
Pocaterra Hydroelectric DamKananaskis151955TransAlta[90]
Raymond Reservoir Generating StationRaymond20.51994Irrican Power
Rundle Hydroelectric DamCanmore501951TransAlta[91]
Spray Hydroelectric DamCanmore1031951TransAlta[92]
St. Mary Hydroelectric DamMagrath21992TransAlta[93]
Taylor Hydroelectric DamMagrath132000TransAlta[94]
Three Sisters Hydroelectric DamCanmore31951TransAlta[95]
Waterton Hydroelectric DamGlenwood31992TransAlta[96]

Wind

List of all wind farms power stations in Alberta.

Name Location Capacity (MW) Date Owner Ref
Ardenville Wind FarmFort Macleod662010TransAlta[2][97]
Blackspring RidgeVulcan County3002014EDF Renewables, Enbridge[98][99]
Blue TrailFort Macleod662009TransAlta[100]
Bull CreekProvost292015BluEarth Renewables[101]
Castle RiverPincher Creek442000–2001TransAlta[102]
Castle Rock Wind FarmDrumheller772012Enel[2]
Castle Rock Ridge 2Pincher Creek292020Enel Green Power[103]
Chin ChuteTaber302006Acciona, Enbridge, Suncor Energy[104][105]
Cowley NorthCowley202001TransAlta[106]
Forty Mile Wind ProjectForty Mile202.52022Suncor[107]
Ghost Pine Wind Energy CentreDrumheller822010NextEra[108]
HalkirkHalkirk1502012Capital Power[109]
Kettles HillPincher Creek632006–2007Enmax[110]
Macleod FlatsFort Macleod32004TransAlta[111]
MagrathMagrath302004Acciona, Enbridge, Suncor Energy[104][105]
McBride LakeFort Macleod752003Enmax, TransAlta[112][113]
Oldman River Wind ProjectPincher Creek3.62007Alberta Wind Energy Corporation[114]
Oldman 2Pincher Creek462014Mainstream Renewable Power[115]
Rattlesnake RidgeWhitla1302022Berkshire Hathaway Energy Canada[116]
RiverviewPincher Creek1052020Enel Green Power[117]
SinnottCowley72001TransAlta[118]
SoderglenFort Macleod70.52006Nexen, TransAlta[119]
Summerview 1Pincher Creek702004TransAlta[120]
Summerview 2Pincher Creek662010TransAlta[121]
Taber Wind FarmTaber802007Enmax[122]
Whitla Wind 1Forty Mile2022019Capital Power[123]
Whitla Wind 2Forty Mile1512021Capital Power[124]
WindriseFort Macleod206.42021TransAlta[125]
WheatlandWheatland County122.42022Greengate Power Corporation[126]
Wintering Hills Wind FarmDrumheller882011Suncor[127]
Cyprus 1 (CYP1)

Cypress Wind Power Project

Forty Mile196Q1 2023EDF Renewables[128][129]
Cyprus 2 (CYP2)

Cypress Wind Power Project

Forty Mile 46 Q1 2023 EDF Renewables [128][129]
Garden Plain (GDP1)

Garden Plain

County of Paintearth No. 18130Q1 2023TransAlta[130][131]
Grizzly Bear Creek (GRZ1)

Grizzly Bear Wind Power Project

Minburn County No. 27152Q1 2023Enel Green Power[132]
Hand Hills (HHW1)

Hand Hills

Starland County145Q1 2023BluEarth Renewables[133]
Hilda Wind (HLD1)

Hilda Wind

Cypress County100Q1 2023RES Canada[134]
Lanfine Wind (LAN1)

Lanfine North Wind Power Project

Special Area No. 3151.2Q1 2023Pattern Energy[135][136]
Jenner 3 (JNR3)

Jenner Wind Project (Phase 3)

Special Area No. 2109Q3 2023Potentia Renewables Inc.[137]
Buffalo Atlee (Phase 1-4)Special Area No. 258.4Q4 2023Capstone Infrastructure[138]
Forty Mile Wind Project Phase 1Forty Mile279.3Q3 2024RES[139]
Jenner Wind Project (Phase 1-2) Special Area No. 2 194 Q3 2023 Potentia Renewables Inc. [137]
Paintearth Wind ProjectSpecial Area No. 18198Q4 2023Potentia Renewables Inc.[140]
Stirling Wind Warner County No. 5 113 (Phase 1) Q4 2023 Greengate Power Corporation [141]
26 (Phase 2)
Sharp HillsSpecial Area 3297.1Q4 2023EDP Renewables[142]
Winnifred Wind ProjectForty Mile122.3Q3 2024Enerfin Energy[143]
Wild Rose 2Cypress County1922024Capstone Infrastructure[144]
Bull Trail WindCypress County270Q3 2023EDF Renewables[145]
Tempest Wind Power ProjectFlagstaff County702024TransAlta Renewables[146]
Buffalo Plains Wind FarmLomond494Q4 2024ABO Wind[147]
Halkirk Wind Project Phase 2Paintearth County No. 18151Q4 2024CapitalPower[148]
Forty Mile Wind Project Phase 2Forty Mile119.7Q3 2025RES[149]
Pihew Waciy Wind ProjectSt. Paul County No. 191302025Northland Power[150]

Solar

List of all solar power stations in Alberta.

Name Location Capacity (MW) Date Owner Ref
Brooks Solar (BSC1)Brooks152017Elemental Energy[151]
Brooks Solar 1 (BRK1)

Brooks Solar II Project

Brooks132022Elemental Energy[152]
Brooks Solar 2 (BRK2)

Brooks Solar II Project

Brooks 14 2022 Elemental Energy [152]
Burdett (BRD1)

Alberta Solar One Project

Burdett10.52021Enbridge, Morgan Solar Inc[153][154]
Burdett Solar (BUR1)Burdett202021BluEarth Renewables[155]
Claresholm 1 (CLR1)

Claresholm Solar Project

Claresholm582021Capstone Infrastructure[156][157]


Claresholm 2 (CLR2)

Claresholm Solar Project

Claresholm 75 2021 Capstone Infrastructure [156][157]


Clydesdale 1 (CLY1)

Clydesdale Solar Project

Municipal District of Taber412022Capital Power[158]
Clydesdale 2 (CLY2)

Clydesdale Solar Project

Municipal District of Taber 34 2022 Capital Power [158]
Coaldale (COL1)

Coaldale Solar Project

Lethbridge County232022ACFN, Concord Coaldale Partnership[159][160]
East Strathmore Namaka (NMK1)

East Strathmore Solar Project

Wheatland County20.52022Elemental Energy[161]
Hays (HYS1)

Canadian Solar Solutions Project

Hays232021BluEarth Renewables [162][163]
Hull (HUL1)

Prairie Sunlight II Project

Vauxhall 25 2020 Solar Krafte Utilities [164]
Innisfail (INF1)

Innisfail Solar

Innisfail222020Elemental Energy[165]
Jenner (JER1)

Canadian Solar Solutions Project

Jenner232021BluEarth Renewables[166][167]
kisikaw-pisim 1 (KKP1)

kīsikāw pīsim Project

Edmonton72022Epcor[168][169]
kisikaw-pisim 2 (KKP2)

kīsikāw pīsim Project

Edmonton 7 2022 Epcor [168][169]
Michichi Solar (MIC1)

Michichi Solar Generation Facility

Starland County 25 2023 Capstone Infrastructure [170]
Monarch (MON1)

Monarch Solar

Lethbridge County242022Concord Coaldale Partnership[171]
Strathmore 1 (STR1)

Strathmore Solar

Strathmore182022Capital Power[172]
Strathmore 2 (STR2)

Strathmore Solar

Strathmore 23 2022 Capital Power [172]
Suffield (SUF1)

Suffield Solar

Suffield232020Suffield Solar GP Inc.[173]
Vauxhall (VXH1)

Prairie Sunlight III Project

Taber222020Solar Krafte Utilities[174]
Three Nations Energy Solar FarmFort Chipewyan[note 2]2.22020Three Nations Energy (joint venture)[175]
Travers (TVS1)

Travers Solar Project

Vulcan County4652022Greengate Power[176]
Westfield Yellow Lake (WEF1)

Yellow Lake Solar

Forty Mile192021BluEarth Renewables[177]
Barlow Solar (BLS1)

Barlow Solar Park

Calgary27Q1 2023DP Energy[178]
Chappice Lake (CHP1)

Chappice Lake Solar Storage Project

Cypress County14Q1 2023Elemental Energy[179][180]
Conrad 1 (CRD1)

Wrentham Solar Project

Wrentham23Q1 2023Solar Krafte[181]
Conrad 2 (CRD2)

Wrentham Solar Project

Wrentham 18 Q1 2023 Solar Krafte [181]
Kneehill Solar (TRH1)

Kneehill Solar Generation Facility

Kneehill County25Q1 2023Capstone Infrastructure [182]
Michichi Creek (MCH1)

Drumheller Solar and Battery Storage Project

Drumheller 13 Q2 2023 Concord Green Energy [183][184]
Stavely (STV1) Stavely 17 Q2 2023 Concord Stavely Partnership [185]
Empress Solar Park (EMP1) Empress 39 Q2 2023 Achernar GP Ltd [186]
Deerfoot Solar ParkCalgary35Q1 2023DP Energy[187]
Fox Coulée Solar ProjectStarland County93Q1 2024Neoen[188]
Métis Crossing Solar Farm ProjectSmokey Lake County4.86Q2 2023Métis Nation of Alberta[189]
Joffre SolarJoffre47Q4 2023PACE Canada LP[190]
Saddlebrook Solar ProjectFoothills County81Q4 2023TC Energy Corporation[191]
Scottford Refinery Solar FarmStrathcona County58Q4 2023Silicon Ranch[192]
Wheatcrest Solar ProjectTaber50Q3 2023BluEarth Renewables[193]
Badger Lands Solar FarmSt. Albert15Q2 2023City of St. Albert[194]
Tilley SolarTilley21Q2 2023Acestes Power[195]
Georgetown Solar ProjectVulcan County230Q3 2023Westbridge Energy Corp.[196]
Lathom Solar ProjectLathom120Q3 2023Greengate Power[197]
Moon Lake Solar ProjectParkland County24.9Q3 2023Voltarix Group[198]
Vauxhall SolarTaber60Q3 2023Solar Krafte[199]
Rocktree Solar ProjectParkland County22.6Q3 2023Voltarix Group[200]
Hanna Sheerness SolarHanna13Q4 2023PACE Canada LP[201]
Caroline SolarCaroline9Q4 2023PACE Canada LP[202]
Spring Coulee SolarSpring Coulee29.5Q4 2023Solar Krafte[203]
Youngstown Solar ProjectYoungstown6Q4 2023Pace Canada LP[204]
Enterprise SolarVulcan65Q4 2023Renewable Energy Systems [205]
Brooks Solar FarmBrooks400Q4 2023Solar Krafte[206]
Creekside Solar ProjectLeduc County24.9Q4 2023Voltarix Group[207]
Foothills Solar ProjectFoothills County150Q4 2023Elemental Energy[208]
High River SolarFoothills County19Q4 2023Elemental Energy[209]
Vulcan SolarVulcan County772023EDF Renewable Energy[210]
Jurassic Solar +Special Area No. 2220Q2 2024Greengate[211]
Luna Solar+ Phase INewell County465Q2 2024Greengate[212]
Sol Aurora Solar ProjectSturgeon County200Q2 2024Alpin Sun[213]
Nova Solar Project Carseland 150 Q3 2024 Renewable Energy Systems [214]
Dunmore Solar ProjectCypress County216Q4 2024Ascent Energy Partners[215]
Saamis SolarMedicine Hat3252024DP Energy[216]
Aira Solar Project Bow Island 450 Q1 2025 Aria [217]
Luna Solar+ Phase IINewell County465Q2 2025Greengate[218]
Estuary Solar Project Cypress County 200 Q4 2025 Greencells IndyGen Alberta Ltd [219][220]
Airport City SolarLeduc120202xAlpin Sun[221]

Storage

Battery

List of all lithium-ion battery storage plants in Alberta.

Name Location Power Capacity (MW) Energy Capacity (MWh) Date Owner Ref
WindChargerPincher Creek10202020TransAlta[222]
eReserve1 RycroftSpirit River20352020Teric Power Ltd[223]
eReserve2 Buffalo CreekWainwright20352021Teric Power Ltd[224]
eReserve3 Mercer HillGrande Prairie20352022Teric Power Ltd[225]
eReserve5 Hughenden 20 January 16, 2023 [226]
WaterCharger Battery StorageCochrane1803602023TransAlta[227]

Pumped hydroelectric

List of all pumped hydroelectric storage plants in Alberta.

Name Location Power Capacity (MW) Energy Capacity (MWh) Date Owner Ref
Canyon CreekYellowhead County75–400[note 3]~2775202xTurning Point Generation, TC Energy[228][229]
Brazeau Hydro Pumped Storage[note 4] 52°57′59″N 115°34′44″W 900 5,000 2025–2026 TransAlta [230][231]

Geomechanical pumped

List of all geomechanical pumped storage plants in Alberta.

Name Location Power Capacity (MW) Energy Capacity (MWh) Date Owner Ref
Brooks 202x Quidnet [232]

See also

Notes

  1. Stalled As of June 2020 yet still on track; see row references for more information (official update).
  2. Off-grid.
  3. Initially 75 MW; expandable to 400 MW.
  4. Pump-back expansion of existing hydroelectric dam site.

References

  1. Healing, Dan (2020-12-04). "Alberta set to retire coal power by 2023, ahead of 2030 provincial deadline". Global News. Retrieved 2020-12-09.{{cite news}}: CS1 maint: url-status (link)
  2. Government of Alberta, "Electricity Statistics", Alberta Energy, archived from the original on 2010-08-26, retrieved 2010-08-27
  3. Seskus, Tony (2020-09-21). "How Alberta — yes, Alberta — could lead Canada in wind and solar by 2025". CBC News. Retrieved 2021-03-06.{{cite news}}: CS1 maint: url-status (link)
  4. CapitalPower, Genesee 1 and 2, retrieved 2021-08-01
  5. CapitalPower, Genesee 3, retrieved 2021-08-01
  6. ATCO Power, Battle River Coal-Fired Generating Station, archived from the original on 2010-07-27, retrieved 2010-08-27
  7. TransAlta, Keephills 1, retrieved 2022-01-01
  8. TransAlta, Keephills 3, retrieved 2022-01-01
  9. "Sundance". TransAlta Power. Retrieved 2022-01-01.
  10. Alberta Energy Regulator, Coal Demand, retrieved 2020-10-07
  11. TransAlta (2010-04-01), TransAlta fully retires all units of its Wabamun power-plant, retrieved 2010-09-06
  12. Maxim Power Corp., Alberta Power Project (APP), retrieved 2010-08-27
  13. "CCGT Plants in Canada - Alberta", Power Plants Around the World, retrieved 2010-08-22
  14. Jones, Jeffrey (2009-06-23), "Nexen may sell gas, power marketing businesses", Reuters, retrieved 2010-08-27
  15. Heartland Generation, Battle River Generating Station, retrieved 2022-06-02
  16. Heartland Generation, Battle River Generating Station, retrieved 2022-06-02
  17. TransCanada, Assets, retrieved 2010-08-27
  18. Alberta Utilities Commission, Genalta Construction GP Ltd. - AUC.ab.ca (PDF), retrieved 2015-03-08
  19. The Alberta Utilities Commission (2013-05-02), Decision 2013-165 – Genalta Power Systems Inc.; 15 MW natural gas-fired power plant (PDF), retrieved 2015-03-06
  20. Enmax, Calgary Energy Centre, archived from the original on 2011-07-10, retrieved 2010-08-22
  21. The Alberta Utilities Commission (2014-06-19), DA2014-145 – Transfer of Ownership of a 15-MW Gas-Fired Turbine Power Plant (PDF), retrieved 2015-03-05
  22. Kineticor, Cascade Power Project, retrieved 2020-09-07
  23. Capital Power Corporation, Clover Bar Energy Centre, archived from the original on 2010-09-04, retrieved 2010-08-22
  24. Enmax, Crossfield Energy Centre, retrieved 2010-08-22
  25. "Empress Cogeneration Power Facility". Alberta Major Projects. Government of Alberta. Retrieved 2021-07-10.{{cite web}}: CS1 maint: url-status (link)
  26. TransAlta, Plants in Operation, retrieved 2012-02-28
  27. "Genesee Power Plant Natural Gas Conversion". Alberta Major Projects. Government of Alberta. Retrieved 2021-07-10.{{cite web}}: CS1 maint: url-status (link)
  28. Capital Power, Genesee Generating Station, retrieved 2021-07-10
  29. "Harvest Operations Gas Fired Power Plant". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.{{cite web}}: CS1 maint: url-status (link)
  30. Heartland Petrochemical Complex, retrieved 2021-12-05
  31. Milner Power, H. R. Milner Generating Station, retrieved 2021-08-01
  32. ATCO Power, Joffre Cogeneration Plant, archived from the original on 2010-07-27, retrieved 2010-08-21
  33. The Alberta Utilities Commission (2014-06-20), DA2014-146 – Transfer of Ownership of 15-MW Gas-fired Power Plant (PDF), retrieved 2015-03-05
  34. TransAlta, SemCAMS Cogeneration Project, retrieved 2020-09-07
  35. AESO, Keephills Generating Station 2, retrieved 2021-08-01
  36. TransAlta, Keephills Generating Station 2, retrieved 2021-08-01
  37. TransAlta, Keephills 3, retrieved 2022-01-01
  38. ATCO Power, Muskeg River Cogeneration Plant, retrieved 2010-08-27
  39. SaskPower, Cogeneration Stations, retrieved 2010-10-09
  40. Constellation Energy, Northern Prairie Power Project – Project Description (PDF), retrieved 2010-08-27
  41. Genaltapower, Genalta Power and Baytex Energy announce activation of first phase in 20MW gas conservation power project, retrieved 2015-03-05
  42. Genalta Power
  43. ATCO Power, Poplar Hill Generating Plant, archived from the original on 2009-02-07, retrieved 2010-08-21
  44. ATCO Power, Primerose Cogeneration Plant, retrieved 2010-08-21
  45. ATCO Power, Rainbow Lake Generating Station 1, 2 and 3, retrieved 2010-08-21
  46. ATCO Power, Rainbow Lake Generating Station 4 and 5, retrieved 2010-08-21
  47. ATCO Power, Scotford Cogeneration Plant, retrieved 2010-08-21
  48. AESO, Sheerness Generating Station, retrieved 2021-08-01
  49. gem.wiki, Sheerness Generating Station, retrieved 2021-08-01
  50. ENMAX, Shepard Energy Centre, retrieved 2015-09-16
  51. ATCO Power, Sturgeon Generating Plant, retrieved 2010-08-21
  52. "Sundance Coal to Gas". TransAlta Power. Retrieved 2021-02-25.
  53. "Three Creeks Power Plant". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.{{cite web}}: CS1 maint: url-status (link)
  54. University of Alberta, Heating Plant, retrieved 2011-09-26
  55. University of Calgary, Central Heating and Cooling Plant, retrieved 2019-05-24
  56. University of Calgary, New U of C power plant will slash emissions, retrieved 2019-05-24
  57. ATCO Power, Valleyview 1 and 2 Generating Plants, retrieved 2010-08-21
  58. "Gas- and Oil-Fired Plants in Canada", Power Plants Around the World, archived from the original on 2009-07-19, retrieved 2010-08-22
  59. Capital Power Corporation (2005-07-28), EPCOR to Decommission Clover Bar Generating Station, retrieved 2010-08-27
  60. Alberta Pacific Forest, Chemical Recovery & Utilities, retrieved 2010-08-27
  61. "Cancarb Sold: Medicine Hat Facility Purchased By Japanese Firm For $190 Million". HuffPost Canada. Retrieved 2017-07-07.
  62. Capital Power Corporation, Clover Bar Landfill Gas, retrieved 2010-08-27
  63. Verdant Energy, Dapp Biomass Project, retrieved 2010-08-27
  64. Maxim Power Corp., Gold Creek, Alberta, retrieved 2010-08-27
  65. Alberta Major Projects, East Calgary Landfill Gas to Electricity Facility, retrieved 2021-12-10
  66. DNatural Resources Canada, Government of Canada Investing in Environmental Improvements at Hinton Pulp Mill, retrieved 2012-10-16
  67. Genaltapower, Genalta Power Aggravated heat recovery, retrieved 2015-03-06
  68. Daishowa-Marubeni International Ltd, Green Power Enhancement Project, retrieved 2012-10-16
  69. Algonquin Power, Valley Power, retrieved 2010-08-22
  70. Alberta Major Projects, Project Wheatland BioFuel Facility, retrieved 2021-12-10
  71. Macquarie Power & Infrastructure Income Fund, Whitecourt, retrieved 2010-08-22
  72. Duncanson, Sander; Kennedy, Jessica; Baker, Jesse (2020-11-02). "Alberta government introduces Bill 36: The Geothermal Resource Development Act". Osler, Hoskin & Harcourt. Retrieved 2021-02-06.{{cite web}}: CS1 maint: url-status (link)
  73. "Greenview Geothermal Power Plant (Alberta No. 1)". Alberta Major Projects. Retrieved 2021-01-12.{{cite web}}: CS1 maint: url-status (link)
  74. "Hydroelectricity in Alberta Today - Electricity & Alternative Energy - Alberta's Energy Heritage". www.history.alberta.ca. Retrieved 2021-02-06.
  75. "Home". AMISK Hydroelectric Project. Retrieved 2021-01-02.
  76. Berrade, David (2020-06-09). "Amisk Hydroelectric Project Update" (PDF).{{cite web}}: CS1 maint: url-status (link)
  77. TransAlta, Barrier Hydroelectric Dam, retrieved 2021-08-01
  78. TransAlta, Bearspaw Hydroelectric Dam, retrieved 2021-08-01
  79. TransAlta, Belly River Hydroelectric Dam, retrieved 2021-08-01
  80. TransAlta, Bighorn Dam, retrieved 2021-08-01
  81. TransAlta, Brazeau Hydroelectric Dam, retrieved 2021-08-01
  82. TransAlta, Cascade Hydroelectric Dam, retrieved 2021-08-01
  83. "IRRICAN POWER GENERAL OVERVIEW" (PDF). St. Mary River Irrigation District. Archived from the original (PDF) on 2012-03-11. Retrieved 2010-08-27.
  84. Algonquin Power, Dickson Dam, retrieved 2010-08-25
  85. TransAlta, Ghost Hydroelectric Dam, retrieved 2021-08-01
  86. TransAlta, Horseshoe Hydroelectric Dam, retrieved 2021-08-01
  87. TransAlta, Interlakes Hydroelectric Dam, retrieved 2021-08-01
  88. TransAlta, Kananaskis Hydroelectric Dam, retrieved 2021-08-01
  89. ATCO Power, Oldman River Hydroelectric Plant, retrieved 2010-08-25
  90. TransAlta, Pocaterra Hydroelectric Dam, retrieved 2021-08-01
  91. TransAlta, Rundle Hydroelectric Dam, retrieved 2021-08-01
  92. TransAlta, Spray Hydroelectric Dam, retrieved 2021-08-01
  93. TransAlta, St. Mary Hydroelectric Dam, retrieved 2021-08-01
  94. TransAlta, Taylor Hydroelectric Dam, retrieved 2021-08-01
  95. TransAlta, Three Sisters Hydroelectric Dam, retrieved 2021-08-01
  96. TransAlta, Waterton Hydroelectric Dam, retrieved 2021-08-01
  97. TransAlta, Ardenville, retrieved 2012-10-02
  98. EDF Renewables, Blackspring Ridge Wind, retrieved 2020-09-06
  99. Enbridge, Blackspring Ridge, retrieved 2020-09-06
  100. TransAlta, Blue Trail, retrieved 2010-08-23
  101. BluEarth Renewables, Bull Creek Wind, retrieved 2020-09-06
  102. TransAlta, Castle River, retrieved 2010-08-22
  103. Enel Green Power, Castle Rock Ridge 2, retrieved 2020-09-06
  104. Acciona Energía, Own facilities, archived from the original on 2009-01-14, retrieved 2010-08-22
  105. Suncor Energy, Wind Energy, retrieved 2010-08-22
  106. TransAlta, Cowley North, retrieved 2010-08-22
  107. Suncor Energy, Forty Mile Wind Power Project, retrieved 2021-12-10
  108. NextEra Energy, Ghost Pine Wind Energy Centre Fact Sheet (PDF), retrieved 2012-10-02
  109. Capital Power, Halkirk Wind Project, retrieved 2012-10-04
  110. Enmax, Kettle Hills Wind Farm, retrieved 2010-08-22
  111. TransAlta, Macleod Flats, retrieved 2010-08-22
  112. TransAlta, McBride Lake, retrieved 2010-08-22
  113. Enmax, McBride Lake Wind Farm, archived from the original on 2010-07-13, retrieved 2010-08-22
  114. Alberta Wind Energy Corporation, Projects, archived from the original on 2010-04-21, retrieved 2010-08-23
  115. Mainstream RP, Oldman Wind Plant, retrieved 2010-08-22
  116. Berkshire Hathaway Energy Canada, Rattlesnake Ridge Wind Project, retrieved 2022-02-27
  117. Enel Green Power, Riverview, retrieved 2010-08-22
  118. TransAlta, Sinnott, retrieved 2010-08-22
  119. TransAlta, Soderglen, retrieved 2010-08-22
  120. TransAlta, Summerview, retrieved 2010-08-22
  121. TransAlta, Summerview 2, retrieved 2010-08-22
  122. Enmax, Taber Wind Farm, retrieved 2010-08-22
  123. Capital Power, Whitla Wind, retrieved 2020-09-06
  124. Capital Power, Whitla Wind 2, retrieved 2020-09-07
  125. TransAlta, Windrise, retrieved 2020-11-29
  126. Greengate Power Corporation, Wheatland Wind Project, retrieved 2020-09-07
  127. Suncor Energy, Wind Power, retrieved 2012-10-02
  128. EDF Renewables, Cypress Wind Power Project, retrieved 2021-05-08
  129. Alberta, Government of. "Cypress Wind Power Project". majorprojects.alberta.ca. Retrieved 2023-04-15.
  130. TransAlta, Garden Plain Wind Projet, retrieved 2021-04-11
  131. Alberta Major Projects, Garden Plain Wind Project, retrieved 2021-06-05
  132. Grizzly Bear Wind Power Project, Grizzly Bear Wind Power Project, retrieved 2021-07-05
  133. BluEarth Renewables, Hand Hills Wind Project, retrieved 2021-12-10
  134. RES Canada, Hilda Wind, retrieved 2021-12-10
  135. Lanfine Wind Power Project, Lanfine Wind Power Project, retrieved 2023-01-20
  136. Alberta, Government of. "Lanfine North Wind Power Project". majorprojects.alberta.ca. Retrieved 2023-04-15.
  137. Jenner Wind Project, Jenner Wind Project (Phase 1-3), retrieved 2021-06-05
  138. Buffalo Atlee, Buffalo Atlee (Phase 1-4), retrieved 2021-06-05
  139. "Forty Mile Wind Project Phase 1". RES. Retrieved 2023-01-20.
  140. Paintearth Wind Project, Paintearth Wind Project, retrieved 2023-01-20
  141. Stirling Wind, Stirling-Wind, retrieved 2021-10-07
  142. EDP Renewables, Sharp Hills Wind Farm, retrieved 2021-08-20
  143. Enerfin Energy, Winnifred Wind Project, retrieved 2022-07-12
  144. Capstone Infrastructure, Wild Rose 2 Wind Power Project, retrieved 2022-07-12
  145. EDF Renewables, Bull Trail Wind, retrieved 2020-11-29
  146. Major Projects Alberta, Tempest Wind Power Project, retrieved 2021-06-05
  147. "Buffalo Plains Wind Farm". Retrieved 2023-01-20.
  148. CapitalPower, Halkirk Wind Project Phase 2, retrieved 2021-12-10
  149. "Forty Mile Wind Project Phase 1". RES. Retrieved 2023-01-20.
  150. Major Projects Alberta, Pihew Waciy Wind Project, retrieved 2023-01-20
  151. Elemental Energy, Brooks Solar, retrieved 2020-09-01
  152. Elemental Energy, Brooks Solar II, retrieved 2020-09-07
  153. Enbridge, Alberta Solar One Project, retrieved 2021-02-25
  154. Morgan Solar Inc, Alberta Solar One, retrieved 2021-02-25
  155. BluEarth Renewables, Burdett Solar Project, retrieved 2020-09-01
  156. AESO, New Assets Claresholm (CLR1 and CLR2) Notice, retrieved 2021-01-26
  157. Capstone Infrastructure, Claresholm, retrieved 2021-02-25
  158. "Clydesdale Solar". Clydesdale Solar. Retrieved 2023-01-25.
  159. AESO, Coaldale Solar, retrieved 2022-04-18
  160. Kiehlbauch, Pat. "ACFN Green Energy LP". Greenplanet Energy Analytics. Retrieved 2023-04-15.
  161. Elemental Energy, East Strathmore Solar Project, retrieved 2022-06-02
  162. Canadian Solar, Hays Solar Project, retrieved 2020-11-29
  163. "Hays Solar Facility | Projects". BluEarth Renewables. Retrieved 2023-04-15.
  164. Solar Krafte Utilities, Prairie Sunlight II, retrieved 2020-09-01
  165. Elemental Energy, Innisfail Solar, retrieved 2020-09-01
  166. Canadian Solar, Jenner Solar Project, retrieved 2020-11-29
  167. "Jenner Solar Facility | Projects". BluEarth Renewables. Retrieved 2023-04-15.
  168. Epcor, Kisikaw Pisim, retrieved 2020-09-07
  169. Alberta, Government of. "kīsikāw pīsim Solar Farm (formerly E.L. Smith Solar Farm)". majorprojects.alberta.ca. Retrieved 2023-04-15.
  170. "Michichi Solar Capstone Infrastructure". Retrieved 2021-07-05.
  171. AESO, Monarch Solar, retrieved 2022-04-18
  172. Solar Krafte, Strathmore Solar Farm, retrieved 2020-09-07
  173. Suffield Solar GP Inc, Suffield Solar (PDF), retrieved 2020-09-01
  174. Solar Krafte Utilities, Prairie Sunlight III, retrieved 2020-09-01
  175. Omstead, Jordan (2020-11-19). "Indigenous-owned solar farm opens in remote northern Alberta community". CBC. Retrieved 2020-11-29.{{cite news}}: CS1 maint: url-status (link)
  176. Greengate Power, Travers Solar, retrieved 2021-08-13
  177. BluEarth Renewables, Yellow Lake Solar Project, retrieved 2020-09-07
  178. DP Energy, Barlow Solar Park, retrieved 2020-09-07
  179. "Chappice Lake Solar Storage Project". Elemental Energy. Retrieved 2021-12-10.{{cite web}}: CS1 maint: url-status (link)
  180. "New Asset Chappice Lake (CHP1) Notice". AESO. Retrieved 2023-04-24.
  181. Solar Krafte, Wrentham Solar Project, retrieved 2020-09-07
  182. "Kneehill Solar Capstone Infrastructure". Retrieved 2021-07-05.
  183. "New Asset Michichi Creek (MCH1) Notice". AESO. Retrieved 2023-04-15.
  184. DrumhellerMail.com, Pat Kolafa | © (2021-07-08). "Drumheller solar project changes hands". DrumhellerMail. Retrieved 2023-04-15.
  185. "New Asset Stavely (STV1) Notice". AESO. Retrieved 2023-04-30.
  186. "New Asset Empress Solar Park (EMP1) Notice". AESO. Retrieved 2023-04-30.
  187. DP Energy, Deerfoot Solar Park, retrieved 2020-09-07
  188. "Fox Coulée Solar Project". Neoen. Retrieved 2022-12-23.{{cite web}}: CS1 maint: url-status (link)
  189. Métis Nation of Alberta, Métis Crossing Solar Farm Project, retrieved 2022-12-23
  190. PACE Canada LP, Joffre Solar - 47 MW, retrieved 2020-11-29
  191. "Saddlebrook Solar and Storage Project". TC Energy. Retrieved 2021-07-27.{{cite web}}: CS1 maint: url-status (link)
  192. CBC Canada, Scottford Refinery Solar Farm, retrieved 2021-12-10
  193. "BluEarth Renewables". Retrieved 2021-12-10.{{cite web}}: CS1 maint: url-status (link)
  194. "Badger Lands Solar Farm". Alberta Major Projects. Government of Alberta. Retrieved 2021-07-05.{{cite web}}: CS1 maint: url-status (link)
  195. "Tilley Solar Project". Alberta Major Projects. Government of Alberta. Retrieved 2022-12-23.
  196. Georgetown Solar Project, retrieved 2022-12-23
  197. Lathom Solar Project, Lathom Solar Project, retrieved 2021-05-12
  198. Voltarix Group, Moon Lake Solar Project, retrieved 2021-12-10
  199. Solar Krafte, Vauxhall Solar Farm, retrieved 2021-12-10
  200. Voltarix Group, Rocktree Solar Project, retrieved 2021-12-10
  201. PACE Canada LP, Hanna Sheerness Solar - 13 MW, retrieved 2020-11-29
  202. PACE Canada LP, Caroline Solar - 9 MW, retrieved 2020-11-29
  203. Solar Krafte, Spring Coulee Solar Project, retrieved 2020-09-07
  204. "Youngstown Solar Project". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.{{cite web}}: CS1 maint: url-status (link)
  205. "Enterprise Solar Project". www.enterprise-solar.com. Retrieved 2021-12-10.
  206. Solar Krafte, Brooks Solar Farm, retrieved 2021-04-11
  207. Voltarix Group, Creekside Solar Project, retrieved 2021-12-10
  208. Elemental Energy, Foothills Solar Project, retrieved 2022-04-18
  209. "High River Solar". Elemental Energy. Retrieved 2022-08-21.{{cite web}}: CS1 maint: url-status (link)
  210. EDF Renewable Energy, Vulcan Solar, retrieved 2020-09-07
  211. Greengate, Jurassic Solar +, retrieved 2022-08-21
  212. Luna Solar+ Phase I, retrieved 2022-12-23
  213. Alberta Major Projects, Sol Aurora Solar Project, retrieved 2022-08-21
  214. "The Nova Solar Power Project | Nova solar - about the project". www.novasolarproject.com. Retrieved 2023-05-17.
  215. "Dunmore Solar Project". Dunmore Solar Project. Retrieved 2021-12-10.
  216. DP Energy, Saamis Solar, retrieved 2022-08-21
  217. "Aira Solar Project Connection (2461)". AESO. Retrieved 2023-04-24.
  218. Luna Solar+ Phase II, retrieved 2022-12-23
  219. "Estuary Solar Project Connection (2418)". AESO. Retrieved 2023-05-17.
  220. "Home". Estuary Solar - Alberta. Retrieved 2023-05-17.
  221. EIA, World’s-largest airport solar farm arriving at EIA, retrieved 2020-09-07
  222. TransAlta, WindCharger Battery Storage, retrieved 2020-09-06
  223. Teric Power Ltd, eReserve1, retrieved 2020-11-29
  224. Teric Power Ltd, eReserve2, retrieved 2020-11-29
  225. Teric Power Ltd, eReserve3, retrieved 2020-11-29
  226. "New Asset eReserve5 Hughenden (ERV5) Notice". AESO. Retrieved 2023-02-09.
  227. TransAlta, WaterCharger Battery Storage, retrieved 2022-08-27
  228. Turning Point Generation, The Canyon Creek Project, retrieved 2020-11-29
  229. Masha Scheele, Canyon Creek Project eyes 2021 build, retrieved 2020-11-29
  230. "Management's Discussion and Analysis" (PDF). TransAlta. March 2019. p. 1. Retrieved 2020-02-06.{{cite web}}: CS1 maint: url-status (link)
  231. "TransAlta Renewables Inc. Investor Presentation" (PDF). TransAlta Renewables. March 2018. pp. 19–22. Retrieved 2021-02-06.{{cite web}}: CS1 maint: url-status (link)
  232. Shumkov, Ivan (2021-06-18). "Quidnet Energy plans multi-gigawatt geologic storage project in Alberta". Renewables Now. Retrieved 2021-07-22.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.