Hollandse Kust Zuid Offshore Wind Farm
Hollandse Kust Zuid Wind Farm (officially Hollandse Kust (Zuid) Wind Farm Zone) is an offshore wind farm being built in the Dutch part of the North sea. The farms consists of 4 sites and 2 wind farms.[1] Both farms are developed by Vattenfall. The farm will have a total installed capacity of 1540 MW.
| Hollandse Kust Zuid | |
|---|---|
| Country |
|
| Coordinates | 52°22′00″N 4°07′00″E |
| Status | Under construction |
| Construction began |
|
| Owner(s) | |
| Operator(s) | |
| Wind farm | |
| Type | |
| Rotor diameter |
|
| Power generation | |
| Units planned | 140 × 11 MW |
| Nameplate capacity |
|
| External links | |
| Website | vattenfall-hollandsekust |
Construction of the farm started in June 2021. The wind farm is expected to be fully operational in 2023.
The farm consists of 140 Siemens Gamesa 11.0-200 DD wind turbines with a capacity of 11 MW each.[2]
Wind Farms
Hollandse Kust (Zuid) I & II
The tender for this farm was held in December 2017. Chinook, a subsidiary of Vattenfall, was announced the winner on 19 March 2018.[3] The wind farm has a total capacity of 770 MW.
Hollandse Kust (Zuid) III & IV
The tender for the second farm was held in March 2019. Vattenfall was announced the winner on 10 July 2019.[4] The wind farm will also have a capacity of 770 MW.
See also
References
- "Hollandse Kust (zuid) Wind Farm Zone including Offshore Wind Farm Luchterduinen (LUD)". Noordzeeloket UK. Retrieved 2023-04-04.
- "Frequently asked questions". Windpark Hollandse Kust South. Retrieved 2023-04-04.
- "Hollandse Kust (Zuid) Wind Farm Zone, Sites I and II | RVO.nl". english.rvo.nl. Retrieved 2023-04-04.